Completed Projects

shoppes at South Nevada, Colorado springs, co

image1

10 acre lot development with full demolition and site infrastructure. Also included a 6 foot over-excavation with screening of existing soils.

Including:                                              

  • 6000 CY of Cut/Fill
  • 800 LF of Watermain
  •  500 LF of Critical Grade .5% Sewer
  •  1200 LF of Storm Sewer Including Underground Detention System

resnik soccer FIELDS, colorado springs, co

image2

10 Acre Development of 5 Soccer Fields for Rush soccer.  

 Including:                                                   

  • Lot Grading to +/- a Tenth for Top Soil Placement
  • Utilized GPS Machine Control to Fast Track Completion
  • Water Service Hook Up for Site

Monument Self Storage, Monument, CO

image3

5 Acre Lot Development for Indoor Self Storage Units.

Including:                                                     

  • Structural excavation including neat digging
  • 8000 CY Cut/Fill
  • 1200 LF of Watermain and Sewer
  • Complete Storm Water System Featuring Outlet Structures/Full Spectrum Detention Pond 



Drury inn, Colorado Springs, Co

image4

5 acre lot development for a ground up new hotel.

Including:                                                

  • 4000 CY Cut/Fill
  • Blue Topping of 50,000 SF Parking Lot 
  • 1200 LF of Water & Sanitary Sewer Main
  • 1500 LF of Storm Mainline Including Several Different Types of Inlets

CDC 135 Ft Carson, Colorado springs, co

image5

5000 SF School development located on Fort Carson Military Base.

Including:                                                

  • 3000 CY Cut/Fill
  • 800 LF of Sanitary Sewer
  • 600 Lf of Water Main
  • Parking Lot Grade
  • Detention Pond


Drainage Box Culvert, colorado springs, co

image6

Excavated existing drainage ditch and replaced with drainage box culverts.

Including:                                                

  • 200 Lf of Drainage Box Culverts